Projects

According to the damage assessment report prepared after the NDT activities, following the IP valve disassembly we performed in the power generation plant operating in Colombia, the following works have been successfully completed.

  • Disassembly of the Valve
  • NDT Activities
  • Fact Finding
  • On-Site Machining of the Valve Casing
  • Overhaul & Repair Activities
  • Re-Assembly of the Valve

 

Project Details

Turbine Type

Alstom Steam Turbine                          

Scope

Repair of Stop Valve 

Capacity

160 MW

Colombia - Repair of GE IP Stop Valve