Within the scope of the Steam Turbine commissioning activities, the Turbine, Condenser, Generator and auxiliary equipments were checked and functional tests were carried out, necessary repairs were made, all electrical equipment was checked and tested, and the unit was successfully commissioned.
Customer |
MAV Electric |
Plant Name |
Göynük MAV Electric Biomass Power Plant |
Turbine Type |
Chola Turbo Steam Turbine |
Scope |
Turbine Commissioning Studies |
Capacity |
1 MW |
Completion Date |
30.11.2020 |