Joule Energy has completed the 671 MW Power Plant installation project in Tripoli, Libya.
In our completed project in Tripoli / Libya, besides 2 Siemens 4000F Gas Turbines, the following equipment is assembled by Joule Energy.
- Air Intake,
- Pipelines,
- diffuser,
- T-Box,
- Stack,
- BOP.