The Mechanical & Electrical Installation of the 85 MW Doosan Steam Turbine were completed together with the tests and successfully put into operation.
Customer |
Doosan Škoda Power |
Plant Name |
IMM Waste Incineration and Energy Production Facility (WtE) |
Turbine Type |
Doosan Skoda Steam Turbine |
Scope |
Electro-Mechanical Turbine Installation |
Capacity |
85 MW |
Completion Date |
10.01.2021 |