The 13 MW Capacity Steam Turbine Generator was delivered to the customer after bearing controls, Rotor controls and tests, and Balanced at Low Speed.
Customer |
Eti Aluminum |
Plant Name |
Eti Aluminum Seydişehir Facility |
Turbine Type |
ENK40/50 Hangzhou Steam Turbine |
Scope |
Generator Maintenance and Rotor Balancing at Low Speed |
Capacity |
13 MW |
Completion Date |
14.07.2021 |