  • Tripoli West 671 MW SCPP - 4 x 168 MW Siemens Gas Turbine Installation / Libya

In our completed project in Tripoli / Libya, besides 2 Siemens 4000F Gas Turbines, the following equipment is assembled by JE.

  • Air Intake,
  • Pipelines,
  • diffuser,
  • T-Box,
  • Stack,
  • BOP.
Project Details

Customer

ENKA İnşaat

Plant Name

671 MW Tripoli West SCPP / Libya

Turbine Type

Siemens 2000E Gas Turbine

Scope

Installation of 4 Gas Turbines, Diffuser, Stack, BOP

Capacity

671 MW

Tripoli West 671 MW SCPP - 4 x 168 MW Siemens Gas Turbine Installation / Libya