In our completed project in Tripoli / Libya, besides 2 Siemens 4000F Gas Turbines, the following equipment is assembled by JE.
Customer |
ENKA İnşaat |
Plant Name |
671 MW Tripoli West SCPP / Libya |
Turbine Type |
Siemens 2000E Gas Turbine |
Scope |
Installation of 4 Gas Turbines, Diffuser, Stack, BOP |
Capacity |
671 MW |